![]()
"Used Squirrel Cage motors for sale"America's oldest industrial equipment marketplace, since 1924, reports steady buyer and seller activity for used AC motors, DC motors, and rebuilt units as manufacturers weigh cost and availability due to large lead times from copper shortages.
Surplus Record, the industrial equipment marketplace with the largest inventory of electric motors on the web, operating continuously since 1924, is reporting sustained buying and selling activity in used and rebuilt electric motors across its platform. With prices on new motors rising and lead times extending on large-frame and specialty units, industrial buyers in manufacturing, mining, water treatment, and processing sectors continue to source AC and DC motors through the secondary market to control costs and keep equipment running.
Several factors are driving this increased demand. Reshoring and new plant investment across the U.S. have increased the installed base of motor driving machine tools and equipment. Meanwhile many aging infrastructure in water, steel and mining plants means they need to replace their motors. Finally, lead time on large frame and medium voltage motors have increased to 6+ months due to copper shortages that are driven from a huge increase in transformers due to the AI boom demand for generating electricty.
Electric motors remain one of the most consistently traded equipment categories on Surplus Record. Demand spans general-purpose three-phase induction motors in the 1 to 500 HP range, large-frame units above 500 HP, and DC motors used in metal processing, cranes, hoists, and legacy drive systems where direct replacement is often the fastest path back to production. Because many DC motor lines have been discontinued or consolidated by manufacturers, the secondary market frequently serves as the primary source for matching frame sizes and specifications on older installed equipment.
Buyers can browse used AC electric motors and used DC electric motors on Surplus Record, with listings searchable by horsepower, RPM, voltage, frame, and manufacturer, including units from GE, Westinghouse, Reliance, Baldor, Siemens, TECO, and WEG & others. Inventory ranges from surplus new and unused motors to used, rebuilt, and reconditioned units offered by motor dealers across North America.
"Motors are the workhorse category of the used equipment market," said Thomas Scanlan, President of Surplus Record. "When a plant loses a motor, production is down until it's replaced. A used or rebuilt motor that ships this week is often worth more to that buyer than a new one that arrives in six months. On the sell side, dealers and plants with surplus motors are finding ready buyers, especially for large-frame AC units and hard-to-find DC configurations."
Sellers with surplus motors, whether individual units or full plant inventories, can list equipment directly on the platform, where listings reach Surplus Record's audience of industrial end users, engineers, and equipment dealers. The marketplace does not buy or sell equipment itself and charges no commissions, connecting buyers directly with sellers.
Media Contact
Company Name:Surplus Record
Contact Person: Tom Scanlan
Email:Send Email
Phone: 3123729077
Address:20 North Wacker Dr. Ste 2400
City: Chicago
State: IL
Country: United States
Website:www.surplusrecord.com
Press Release Distributed by ABNewswire.com
To view the original version on ABNewswire visit: Used Electric Motor Market Stays Active as Buyers Seek Alternatives to Long Lead Times and Rising Prices on New AC and DC Motors, Reports Surplus Record
Comments
No comments on this item Please log in to comment by clicking here